CDC at Scale: When Debezium Becomes the Critical Path


Three squads in one mobile codebase means merge queues, 45-minute CI, and blocked releases. Feature modules, monorepo tooling, and the tribe topology that fix it.
The hard part of RAG is the lifecycle, not the first embedding. Keep millions of vectors fresh, version-consistent, and migratable — without downtime or silent drift.
Distributed rate limiting is the unsexy infrastructure capability that quietly decides whether a service stays up under abusive traffic, retry storms, partner-integration bursts, or the autonomous AI agent that decided 4 a.m. is the perfect time to make 200,000 sequential calls. This article is the production design guide: the five canonical algorithms (fixed window, sliding window log, sliding window counter, token bucket, leaky bucket) with their accuracy and memory characteristics, the Redis-Lua single-shot implementation, multi-region coordination strategies, hot-key handling for keys that receive 100x normal traffic, the failure modes of the limiter itself, and the configuration values that work at scale.
How to structure Terraform for many teams in 2026: state is the unit of blast radius, so layer it by owner and change cadence, then pick Stacks or Terragrunt.
Advertise and partner
Reach engineering leaders and CTOs reading about AI, mobile and cloud architecture.
Sponsored mentions and co-authored articles or technical deep-dives. Relevant products only, always disclosed.